Keep track of your changes in the Change Manager Palette, available here:
•Window > Palettes > Change Manager
• Show Change Manager from the pop-up menu at the upper left corner of the Navigator/Organizer
The top of the Change Manager lists all Changes in the project.
Note: Change Markers placed as “unlinked” are not listed in Change Manager. Unlinked Change Markers are graphical elements that are not linked to anything, but you can link them at any time to existing Changes.
•Untransmitted Changes: A Change on the currently active Layout that has not yet been transmitted is also listed in blue type in the Change Manager. (The Layout window must be open for this feedback to be visible.)
•Transmitted Changes: Changes that have been transmitted on at least one Layout revision have a green Transmittal Set icon on it. (These changes can still be added to other Layout revisions.)
•Archived Changes: Optionally, you can archive some or all of your transmitted changes and list them separately in the Change Manager. (See Archive Changes in Change Manager.)
•Changes in external files: Changes (except Archived Changes) that arrive in the host file via a Hotlink or external drawing are shown with a lock icon. (See Changes from External Files.)
Use the context menu of any selected Change to access relevant commands. Note that these differ for transmitted and for untransmitted Changes. (Transmitted Changes cannot be deleted from the project, but they can be archived.)
From the linked element(s) at the bottom of the Change Manager, select any element and double-click to zoom to that element in the open window (if it is visible) or in the source view (if it is not currently visible).