Use the Interactive Schedule function to generate schedules. The Interactive Schedule not only displays quantities and other parameters - you can actually edit it. Any changes you make in these fields of the Schedule are automatically and instantly reflected in the Floor Plan and in other views, when activated. Conversely, all changes made on these elements in the Floor Plan or another editable view are updated in the Schedule when you return to it.
Schedules are viewpoints, which you can save as views and output as drawings on a Layout, or save in various other file formats.
See Save from Schedule Window (Interactive Schedule).
A formatted schedule can be placed into any 2D window (typically a Worksheet), by using Copy/Paste. The contents of the schedule, after pasting, will consist of lines and text, which you can freely edit, but will no longer be associative to the model.
Types of Interactive Schedules
Units in Interactive Schedules
Show Schedule Data for Selected Floor Plan Items
Editing and Updating Schedule Items
Select Schedule Items on Floor Plan/3D
Define Schedule Content Using Scheme Settings
Format Options (Interactive Schedule)
Previews and Pictures in the Interactive Schedule
Restructure Schedule to Fit Layout
Split Schedule into Multiple Layouts
Related Topics:
Component Listing Parameters in the Interactive Schedule
For Teamwork Users: